May 25, 2008
After a month-long hiatus to enjoy my new puppy, work begins again on the workshop. A lot of hours
went into running electrical to new outlets, and tidying up some old wiring. Meanwhile, the first of
the drywall goes up.
The chest freezer (currently shown a work bench) will slide into the corner cubby.
There is still more drywall ahead, but this shot shows where the light switch for the workshop is located.
The wiring needed to be above ceiling level, so joists were drilled and the wires run though the joist holes.
I had to re-route the phone lines as well.
The new walls have outlets.
The drywall is making the workshop start to look like an actual room.
| Back | Top |
|