July 8, 2006 - Work Day 15
![](2006patio/20060708/IMG_1376.jpg)
After removing dirt, work begins on resurfacing the foundation wall. First a rinse...
![](2006patio/20060708/IMG_1378.jpg)
Then the wall is allowed to dry.
![](2006patio/20060708/IMG_1379.jpg)
A view from the pool deck. The last of the dirt was removed to prep for the mulch garden.
![](2006patio/20060708/IMG_1380.jpg)
The foundation then got a generous coat of C-21 acrylic mixed 1:1 to seal the wall.
![](2006patio/20060708/IMG_1382.jpg)
A brick chisel made short work of the old concrete lump. Any loose skim coat was also removed.
![](2006patio/20060708/IMG_1383.jpg)
Two 80-pound bags of concrete finish later, the wall has a new face.
![](2006patio/20060708/IMG_1387.jpg)
The products and the dealer I used were fantastic. Information available on request.
![](2006patio/20060708/IMG_1388.jpg)
The finish was applied with a brick trowel and a finish trowel.
After a good set,
a damp sponge
was used to provide the final texture. The color will even out to a light gray as it sets fully.
![](2006patio/20060708/IMG_1389.jpg)
The sod placed last weekend is doing well with twice daily watering.
![](2006patio/20060708/IMG_1390.jpg)
The completed walkways have cured.
![](2006patio/20060708/IMG_1392.jpg)