June 5, 2006 - Work Day 6
The patio base is in, leveled and covered with that tarp to prevent a washout.
Empty patio base bags litter the area.
A view of the installed patio base, from the pool deck.
My plans are to fill the crack in the foundation, chip off that extra piece of concrete, and resurface.
| Back | Top |
|