March 10-23, 2007
![](2007bedroom/20070323/IMG_2772.jpg)
Priming continues on the new window casings.
![](2007bedroom/20070323/IMG_2776.jpg)
The new closet doors are primed as well.
![](2007bedroom/20070323/IMG_2798.jpg)
Kilz Premium water-based primer is my primer of choice.
![](2007bedroom/20070323/IMG_2802.jpg)
After the windows, doors and baseboards were primed, I moved on to the walls.
![](2007bedroom/20070323/IMG_2803.jpg)
I like to give all the walls a primer coat to ensure an even look to the final color.
![](2007bedroom/20070323/IMG_2805.jpg)
The thick primer also smooths out minor imperfections and seals the spackle used to fill holes.
![](2007bedroom/20070323/IMG_2834.jpg)
The bathroom is also primed. Removing the old light fixture revealed sub-standard electical work.
![](2007bedroom/20070323/IMG_2809.jpg)
The primed walls are smooth and even...ready for a color.
![](2007bedroom/20070323/IMG_2811.jpg)
The closet interior is also primed.
![](2007bedroom/20070323/IMG_2824.jpg)
The wall priming complete, work turns to the ceiling, which receives a fresh coat of white ceiling paint.
![](2007bedroom/20070323/IMG_2826.jpg)
The ceiling of the bathoom is also painted. Since the bathroom is newer, it has a "popcorn" ceiling.
![](2007bedroom/20070323/IMG_2830.jpg)
Since the master bathroom is out-of-commission, it was a great time to re-caulk the sink and shower.
![](2007bedroom/20070323/IMG_2835.jpg)
Work now turns to finishing the doors and trim, which will all receive two coats of high-gloss white.
![](2007bedroom/20070323/IMG_2837.jpg)
The first coat is under way.