May 17, 2009
Work continues on installing the trim along the floor and around the doorways.
In the foyer.
The other end of the foyer.
On the living room side of the archway, I went a little more decorative.
The baseboard moulding stops where the heating baseboard will be installed.
A close-up of the living room archway detail. This will be painted bright white.
Another view of the archway, looking towards the front door.
With the baseboard installed, many of the tools are put away.
The front door also received decorative trim, though I went a little less decorative than the living room,
since the foyer is a much smaller space.
A close-up of the new baseboard moulding and the fluted casing meeting at the plinth block.
The nail holes are filled, and the trim is ready for paint.