May 17, 2009
![](2009livingroom/20090517/Img_7046.jpg)
Work continues on installing the trim along the floor and around the doorways.
![](2009livingroom/20090517/Img_7047.jpg)
In the foyer.
![](2009livingroom/20090517/Img_7048.jpg)
The other end of the foyer.
![](2009livingroom/20090517/Img_7050.jpg)
On the living room side of the archway, I went a little more decorative.
![](2009livingroom/20090517/Img_7051.jpg)
The baseboard moulding stops where the heating baseboard will be installed.
![](2009livingroom/20090517/Img_7052.jpg)
A close-up of the living room archway detail. This will be painted bright white.
![](2009livingroom/20090517/Img_7055.jpg)
Another view of the archway, looking towards the front door.
![](2009livingroom/20090517/Img_7056.jpg)
With the baseboard installed, many of the tools are put away.
![](2009livingroom/20090517/Img_7058.jpg)
The front door also received decorative trim, though I went a little less decorative than the living room,
since the foyer is a much smaller space.
![](2009livingroom/20090517/Img_7062.jpg)
A close-up of the new baseboard moulding and the fluted casing meeting at the plinth block.
The nail holes are filled, and the trim is ready for paint.
| Back | Top |
|