December 11, 2011
![](2011guestbathroom/20111211/Img_9442.jpg)
After grouting a day earlier, the floor is cleaned and polished, and the shoe molding is reinstalled.
![](2011guestbathroom/20111211/Img_9444.jpg)
Black grout is messy, but the results are pretty impressive.
![](2011guestbathroom/20111211/Img_9445.jpg)
The new floor.
![](2011guestbathroom/20111211/Img_9446.jpg)
The toilet is reinstalled.
![](2011guestbathroom/20111211/Img_9447.jpg)
The sink required raising the wall anchors, because the granite raised the floor almost a half-inch.
![](2011guestbathroom/20111211/Img_9449.jpg)
The project is coming together.
![](2011guestbathroom/20111211/Img_9457.jpg)
Work turns to fixing the electrical. I replaced the light switch with a paddle style that lights up
when it's off, so guests can quickly locate it. The GFCI outlet was wired with reverse polarity,
so that was another screw-up from the former homeowners I had to fix.
![](2011guestbathroom/20111211/Img_9458.jpg)
The frosted glass shades are cleaned and reinstalled, along with the mirror.
![](2011guestbathroom/20111211/Img_9461.jpg)
A hidden-screw
switch plate dresses up the switch.
![](2011guestbathroom/20111211/Img_9463.jpg)
The brushed nickel hardware replaces the old polished brass.
![](2011guestbathroom/20111211/Img_9464.jpg)
The toilet paper holder is relocated to the left of the door.
![](2011guestbathroom/20111211/Img_9466.jpg)
The display shelf is installed.
![](2011guestbathroom/20111211/Img_9468.jpg)
The project is nearly complete.