June 6, 2014
Work continues on reclaiming the pea gravel from around the former garden and adding it to
the edges of the back driveway.
The wood around the old beds was all but destroyed by bugs and rot.
Work begins on dismantling the beds. The plastic was under the pea gravel, and will be discarded.
Some of the boards were rotted through.
The last of the pea gravel is reclaimed for use on the driveway.
The first of the beds is dismantled.
With both beds gone, work turns to salvaging the good garden soil for use in the new beds.
Meanwhile, the reclaimed gravel is spread along the driveway.
After a full day's work, The site is cleaned up, and the good garden soil is piled for future use.
| Back | Top |
|